Client:

Fingal Co. Council

Location:

Fingal Co. Civic Offices

Summary of Service:

Mechanical upgrade of all toilet core facilities, canteen facilities and fit out of new CEO’s office.

We have supplied and installed new modern sanitary ware throughout this site to give the building a new lease of life while ensuring all new water saving devices have been utilized.

The canteen has received a full upgrade from new fire suppression systems and canopy’s to all new services and state of the art kitchen equipment. All new safety features have been installed for electrical isolation of services and gas proving systems c/w remote lock stops.

The new CEOs office has been fully renovated c/w new shower and toilet facilities to new AC and ventilation. New grills have been installed throughout with new linear bar grills installed in the floors for distribution of tempered and air-conditioned air from the AHU and AC equipment.