Client:
Supervalu Group
Design Team:
Quinn Downes / Supervalu Design Engineers
Project:
Supervalu Blackrock Shopping Centre
Project Description
Quinn Downes removed redundant ventilation & boiler plant and installed new gas fired high efficiency boilers, gas detection system and new gas fired AHUs to serve temperature controlled air to the entire shopping space
Date:
2014
Project Value: